A critical mechanical plant replacement for a Peel Regional Police facility — where operational continuity is not just a preference but a public safety requirement. Our team developed a phased mechanical switchover plan that maintained full facility operations throughout, with temporary system bridging and 24/7 on-call support during all critical transition periods.